VALUE
£3,100,000.00
DURATION
32 Weeks
CLIENT
Deconstruct UK Ltd
Deploy UK Ltd assisted Deconstruct UK Ltd to undertake the full Enabling Works package at 100-108 Lower Marsh. The scheme, situated behind Waterloo station saw the soft strip and demolition of an existing 2 story structure with temporary works installed to facilitate the support of adjoining buildings.
Labour Supplied:
• Carpenters
• General Labour
• Machine Drivers
• Handyman
• Strikers