100-108 Lower Marsh.

VALUE

£3,100,000.00

DURATION

32 Weeks


CLIENT

Deconstruct UK Ltd

Deploy UK Ltd assisted Deconstruct UK Ltd to undertake the full Enabling Works package at 100-108 Lower Marsh. The scheme, situated behind Waterloo station saw the soft strip and demolition of an existing 2 story structure with temporary works installed to facilitate the support of adjoining buildings.

Labour Supplied:
• Carpenters

• General Labour

• Machine Drivers

• Handyman

• Strikers