VALUE
£5,000,000.00
DURATION
60 Weeks
CLIENT
Deconstruct UK Ltd
ABOUT
Deploy UK Ltd assisted Deconstruct UK Ltd to carryout refurbishment to a 141-143 Harley Street to provide an Enabling Works and Basement Construction solution.
The works executed at the project saw:
• Demolition of an existing Mews building to the rear
• Installation of temporary flying shoring frame to support mews buildings either side
• Secant piling to the perimeter
• 13 meter basement excavation
• Contiguous and Bearing Pile Installation at the new formation level
• Reinforced waterproof concrete subterranean structure
Labour Supplied:
• Carpenters
• Groundworkers
• General Labour
• Traffic Marshalls
• Machine Drivers
• Handyman
• Traffic Marshalls
• Mastic Man